Shoreline stabilization in the territory of the City by the Sea, Black Sea Riviera.
Shoreline stabilization works have been conducted (that included installing drainage systems, stormwater drainage, benching, and provision of hydraulic engineering works); sand beaches have been created.
The total area of the seafront, along with beaches, is over 2 kilometers.